PROJECT BIKES  



We machined a solid dowel of metal to fit inside the tubing of the frame and the axle adjuster forgings, called a slug. Here the top rail slug is installed. This will give the joined pieces enough strength to hold together after being welded.

[add comment]

Powered by Gallery v1.4.3-pl2